Derivation of New Dispersion Coefficient Equation for Natural Streams
A new simple method for predicting dispersion coefficient by using hydraulic and geometric data easily obtained in natural streams has been developed. Dimensional analysis was implemented...

Sediment Erosion Rate in the Baltimore Harbor
In-situ erosion experiments were conducted at four selected sites in the Baltimore harbor in May 1995 using the VIMS Sea Carousel. The measurements showed that the erosion rate decreased...

Accessible Information
As the amount of data relating to U.S. environmental policy grows, geographic information systems and advanced visualization system technology are being applied extensively to site investigations...

Rock Foundations
This manual provides technical criteria and guidance for the design of rock foundations for civil works or other similar large military structures. It provides a minimal standard to be...

From Sediment to Solid
While closing a 32 acre, storm-water impoundment area contaminated with petroleum waste sediments at an oil refinery, engineers came up with a more-effective treatment plan that saved...

High Level Radioactive Waste Management 1996
The proceedings of the Seventh International Conference on High Level Radioactive Waste Management, held on April 29-May 3, 1996, Las Vegas, Nevada, continues a concerted effort to transfer...

Monitor Well Design, Installation, and Documentation at Hazardous and/or Toxic Waste Sites
This manual provides the minimum elements for consideration in the design, installation, and documentation of monitor well placement at projects known or suspected to contain chemically...

Waste Not in Wisconsin
Nationwide, local public works departments wrestle with the problem and costs of cleaning up abandoned landfill sites. Often, municipalities acquire property through tax foreclosures or...

Building a Landfill on Mud(Available only in Geo/Environmental Special Issue)
In the early 1980s, officials at the Delaware Solid Waste Authority (DSWA) thought they had found the ideal site for a new municipal landfill: low acquisition cost, direct access from...

Management of Water Treatment Plant Residuals
Potable water treatment processes produce safe drinking water and generate a wide variety of waste products known as residuals, including organic and inorganic compounds in liquid, solid,...

Bad Vibrations
Insurance companies often hire engineers to investigate homeowner claims of damage caused by vibrations near a blast or construction site. But these engineers often lack the background...

Cold Regions Engineering
The Cold Regions Infrastructure?An International Imperative for the 21st Century
This volume includes papers presented at the Eighth International Conference on Cold Regions Engineering?The Cold Regions Infrastructure: An International Imperative for the 21st Century....

Sound Way to Save Fish
Fish protection need not cost an arm and a fin. Using light and sound to spare fragile blueback herring and other species a harrowing fate, the U.S. Army Corps of Engineers devised a fish...

Engineered Contaminated Soils and Interaction of Soil Geomembranes
Due to liability issues, landfills are no longer considered the best method of waste disposal. Innovative, safe disposal methods for large quantities of contaminated soils and waste are...

Non-Aqueous Phase Liquids (NAPLs) in Subsurface Environment
Assessment and Remediation
The growing number of incidents of soil and groundwater contamination with non-aqueous phase liquids (NAPLs) has caught the nation unprepared. A number of challenges confronted the three...

Boston Blockbuster
The Central Artery/Tunnel project in Boston is probably the single largest publicly-funded transportation project in the country at present. The total cost will be between $8 and $10 billion...

Starting a Project
Project start-up marks the end of the planning activities and the beginning of the project. The PM must take the steps necessary to set up job numbers, job data sheets, assemble data needed...

Cleanup Solution--Conflict Resolution
Distrust and misinformation often prevent timely resolution of ground-water contamination problems. In Toms River, N.J., engineers used a computer-generated model of the cleanup site in...

Insurance and the Environmental Engineer
The grading/excavation contractor had no problem completing the project, a routine regrading job with no visible problems or obstructions at the site, on time and on budget. Two years...

Geoenvironment 2000
Characterization, Containment, Remediation, and Performance in Environmental Geotechnics
The impact of rapid industrialization around the globe and unsafe waste management practices have become increasingly significant within the last two decades as the disclosed number of...

 

 

 

 

Return to search